PLANNING AND CONTRUCTION PHOTOS - PAGE 2
< back | home | next > |
 |
|
 |
|
 |
|
 |
| 2/08/06 Test-fit sidewall braces |
|
2/10/06 Test-fit porta-potty, propane tank, A/C unit, water jug, 5 18-qt. boxes and 3 7 qt. boxes |
|
2/11/06 Gorilla glued sidewall braces to 3/8" interior plywood |
|
2/15/06 Glued foam insulation, wired, glued plastic/space blanket insulation on right sidewall |
| |
 |
|
 |
|
 |
|
 |
| 2/16/06 Painted outline of left sidewall bracing, glued it to interior plywood |
|
2/21/06 Melted wiring channels in Styrofoam w/soldering gun |
|
2/22/06 Wired left sidewall |
|
2/22/06 Glued plastic/space blanket on left sidewall |
| |
 |
|
 |
|
 |
|
 |
| 2/24/06 Added inside braces for shelves, countertop, etc. |
|
2/25/06 Test-fitted left sidewall to floor |
|
2/27/06 Attached sidewalls to floor w/glue, angles, wood screws |
|
3/1/06 Trailer sides are free-standing |
| |